Solar Panels Newry: Mourne Region Installation Guide 2026
Complete guide to solar panel installation in Newry and the Mourne region. Local costs, property types, installer options, and expected savings for Newry homeowners.
Newry, the gateway between Northern Ireland and the Republic, is experiencing significant solar adoption. With excellent solar irradiance and a strategic position serving the Newry, Mourne, and Down district, the city offers outstanding potential for solar energy. This guide covers everything Newry residents need to know.
Why Newry is Ideal for Solar
Newry’s position provides excellent conditions:
- Annual solar irradiance: 960 kWh/kW
- Peak generation months: April to September
- Typical 4.1kW system output: 3,936 kWh per year
The city’s elevated position and mix of urban and rural properties create optimal conditions for solar installations of all sizes.
Solar Panel Costs in Newry
Current pricing for the Newry and Mourne area:
| System Size | Typical Price | Annual Savings |
|---|---|---|
| 3kW (8 panels) | £4,900 - £6,200 | £460 - £580 |
| 4kW (10 panels) | £6,200 - £8,200 | £580 - £770 |
| 5kW (12 panels) | £7,800 - £10,200 | £730 - £960 |
| 6kW+ (15+ panels) | £9,500 - £12,500 | £890 - £1,170 |
Newry has good installer coverage with competitive pricing from both local and regional companies.
Property Types in Newry
City Centre Terraces
Properties around Hill Street and John Mitchel Place:
| Aspect | Details |
|---|---|
| Typical system | 3-4kW |
| Annual generation | 2,880-3,840 kWh |
| Annual savings | £580-£750 |
| Special considerations | Scaffold access, roof orientation |
Victorian terraces often have good rear roof space for solar installations.
Semi-Detached & Detached Homes
Modern developments in Damolly, Ballinlough, and Warrenpoint Road:
| Aspect | Details |
|---|---|
| Typical system | 4-6kW |
| Annual generation | 3,840-5,760 kWh |
| Annual savings | £750-£1,200 |
| Special considerations | Excellent roof orientations |
These properties offer excellent solar potential with larger roofs and optimal orientations.
Rural & Mourne Properties
Properties in the scenic Mourne countryside, Warrenpoint, and Rostrevor:
| Aspect | Details |
|---|---|
| Typical system | 5-8kW |
| Annual generation | 4,800-7,680 kWh |
| Annual savings | £960-£1,500 |
| Special considerations | Minimal shading, excellent exposure |
The Mourne region is ideal for larger installations with space for substantial systems.
Areas Covered
Our installer network covers the entire Newry, Mourne and Down district:
Newry City Centre: BT35 areas including Hill Street, John Mitchel Place, Damolly, Belfast Road, Warrenpoint Road
Surrounding Towns: Warrenpoint, Rostrevor, Kilkeel, Annalong, Mayobridge, Rathfriland
Mourne Region: Hilltown, Castlewellan, Newcastle, Dundrum, Ballynahinch, Crossgar
Agricultural Solar in the Newry Area
The rural areas around Newry offer excellent opportunities for farm-based solar:
Benefits for Farms
- Large roof areas on agricultural buildings
- High energy consumption for equipment and cooling
- Daytime energy usage matching solar generation
- Potential for ground-mounted systems
- Capital allowances for business tax relief
Typical Farm Installations
| Building Type | System Size | Annual Generation | Annual Savings |
|---|---|---|---|
| Small barn | 10-20kW | 9,600-19,200 kWh | £1,500-£3,000 |
| Large shed | 30-50kW | 28,800-48,000 kWh | £4,500-£7,500 |
| Multiple buildings | 50-100kW | 48,000-96,000 kWh | £7,500-£15,000 |
Expected Savings for Newry Homes
Based on typical energy usage patterns:
| Scenario | Annual Generation | Self-Use | Annual Savings |
|---|---|---|---|
| 4.1kW, no battery | 3,936 kWh | 48% | £580 |
| 4.1kW + battery | 3,936 kWh | 78% | £790 |
| 6kW + battery | 5,760 kWh | 75% | £1,100 |
Payback periods:
- Without battery: 10-12 years
- With battery: 11-13 years
Cross-Border Considerations
As a border city, Newry residents may wonder about:
Energy Regulations
- Solar installations follow UK/Northern Ireland regulations
- MCS certification is the UK standard
- NIE Networks handles all grid connections
Installer Choice
- Use MCS-certified installers for warranty and quality assurance
- Northern Ireland-based installers understand local requirements
- Some Republic-based installers also operate in NI but must meet UK standards
Planning Permission in Newry
Most residential installations don’t require planning permission. However:
Historic Canal Area: Properties near Newry Canal may have heritage considerations Listed Buildings: Require specific consent Mourne AONB: Installations visible from scenic areas may need consideration
Local Success Stories
Newry residents are benefiting from solar:
- Detached homes in Damolly: Achieving £1,350 average annual savings
- Victorian terraces near Hill Street: Saving £890 annually
- Rural properties in the Mournes: Larger systems saving over £1,500 per year
Frequently Asked Questions
Do solar panels work well in the Newry area?
Yes. Newry receives excellent solar irradiance of 960 kWh/kW annually. The area’s mix of urban and rural properties provides good opportunities for solar.
Can farms near Newry benefit from solar?
Absolutely. Agricultural properties around Bessbrook, Camlough, and towards the Mournes are ideal for larger installations. Farm buildings often have excellent roof space with minimal shading.
What about battery storage?
Battery storage makes excellent sense in Newry, particularly for:
- Households out during the day
- Evening electricity users
- Those wanting energy independence
- Rural properties seeking backup power
Is the Mourne area suitable for solar?
Yes. The Mourne region offers excellent conditions with minimal shading and open aspects. Properties often have generous roof space for larger systems.
Getting Started
Ready to explore solar for your Newry home or farm? Compare quotes from MCS-certified installers who understand the local area and can advise on the best system for your property.
Get Newry Quotes: Compare prices from trusted installers covering all of Newry, Mourne and Down. Free, no-obligation quotes within 48 hours.
Ready to Go Solar?
Compare quotes from Northern Ireland's top MCS-certified installers. Free, no-obligation quotes in 48 hours.
Get Free Quotes